With the grounding continuing more much needed maintenance has taken place. Jono and Webby spent an entire day repairing the Sedbergh trailer to safely secure the glider inside it. This work continued today with the braking system being overhauled as the old cabling had disintegrated.
Al’s Sedbergh WB981 has been thoroughly washed to remove all the muck following storage at Keevil. WB981 will hopefully be C of A’d soon and taken to Syerston for this years IDT weeks.